The October 2007 article “Longfellow Clubs Going Green” mistakenly reported that Longfellow Clubs will get a large amount of its electricity, heat, domestic hot water and swimming pool heat directly from a 75-kilowatt generator.

In fact, the energy will come from a 75-kilowatt cogeneration facility. A cogeneration facility produces both electricity and heat. In addition, the town in which Longfellow Clubs is located was misspelled. It is in Natick, MA.